A great family home is this three-bedroom end-terrace house in Cumnock, East Ayshire. The property was bought in November 2021, and renovation work began in early 2022. A kitchen with 12 (medium) to 16 (large) L-shaped units and an island by Howden Greenwhich was part of the restoration. equipped with a brand-new electric oven unit, electric hob, electric extractor fan, and stainless steel/glass splashback. A new bathroom suite with luxury vinyl tile flooring, a vanity sink, a toilet, and a bath is available. Installed a wet wall to guarantee the bathroom is waterproof. Before repainting and installing new wall coverings, including carpeting and new coving in all bedrooms, the house was thoroughly cleaned by a professional.The garden was renovated at the same time that the new fence was put in. The property's façade was freshly painted, and a new driveway was constructed. In order to ensure safety, a new boiler has been installed, and all of the plumbing has been rerouted as necessary.

12 (medium)-16(large) units - L shape with island Howden greenwhich kitchen
Plaster repair, new bathroom fixtures and LVT(luxury vinyl tile) bathroom flooring
Bedrooms wall repainted with new carpet and coving
Fence newly installed and garden repaired with new driveway
New gas boiler
All plumbing are re-routed as required
Electricity rewired to secure safety
Completely new heating system
Edgar Avenue
Buy-Refurbish-Rent-Refinance
3 bed end-terraced family home a short distance from the centre of Cumnock
Year built
1976
Area Size
1023
sq. ft
Bathrooms
1
Bedrooms
3
Rooms
7
Kitchen Floor Plan
10.36
Edgar Avenue
Buy-Refurbish-Rent-Refinance
3 bed end-terraced family home a short distance from the centre of Cumnock
Year built
1976
Area Size
1023
sq. ft
Bathrooms
1
Bedrooms
3
Rooms
7
Kitchen Floor Plan
10.36

In true agile fashion this is a photograph of the floor plan drawn by Ross & Matty on the wall of the kitchen - it shows the open plan space once the diving wall between kitchen and living room is removed

Address

67 Edgar Avenue
Cumnock
UK
see on map
see on map

Property Timeline

First look - Ground floor
A home that has potential and is waiting to be revealed.

The ground floor of the property on its early state. The kitchen floor tiles have been removed, and the carpet on the stairs is stained. A few cabinets are damaged. It had fallen into disrepair.

First look - First Floor
Exploring more the potential.

This is the first floor where the rooms are. The wallpapers were peeling and most paints were fading. The bathroom tiles need replacement.

20th January 2022
Re-rendering Complete !
Smooth New Look

Big chunks of missing render wasn't a good look - and presented a risk of water ingress around the windows. This was a category 2 mention in the Home Report. On close inspection, the only option to secure the render on the rear of the house and to complete the water proofing was a complete re-render on that elevation. So we did the right thing and went for it.This included correctly sealing the window surrounds. We also repaired the render on the other two elevations of the house with a colour in similar tone to blend in as much as possible.

23rd December 2021
Roof Repair
Watertight at last !

The first task of the refurb is to make the house watertight - this is an essential pre-requisite before the full internal refurb can start.

7th February 2022
Wall Removal
Wider View at the Ground Floor

We removed the dividing wall between the kitchen and living room to make open plan space. This floor plan maximises the available space while fostering mobility, and illumination within the area.

23rd March 2022
Garden Overhaul
Rip Out Complete

The shed was removed and all items stored internally - and all electrics. The wooden outbuilding from the backyard was dismantled and removed.

28th March 2022
New Fence Installed
Better Barrier

A new fence was built and a gate between the end of the repaired wall and the back wall of the house.

13th April 2022
Back Garden
The Back View

This is the back garden. The landscape is nearly done. We added missing paving, removed all weeds, levelled the land and added membrane, and re-used slabs

14th April 2022
Garden Complete
Garden is Ready

The garden is complete. We repaired the wooden fence/gate at a right angle to a stone wall and joined to the left-hand side of the garage to enclose the back garden. The brickwork on the exit of the back door was also repaired. On the rear wall (on left), we removed loose stones and stabilised the rest of the wall. A new fence and gate between the end of the repaired wall and the back wall of the house were built. It was painted black to correlate with the front fence.

21st April 2022
Outside Painting
Exterior painting is complete

This is the outside painting of the property that is completed. We repaired and painted front fence timbers in black. We removed all weeds from the chips - lay weed fabric and re-apply the chips. After rendering the repair, we power washed the house's front and all outside walls and painted the non-rendered lower part of the wall.

28th April 2022
Interior Preparation
Strip out from the Inside

Without preparation, the home refurbishment process can be full of disappointments as you are not starting with a blank slate. This is one important step in starting the process. Unnecessary objects are being removed from the inside. All wiring to sockets to be chased into walls. Fix satin chrome sockets/light switches throughout. Remove old arrow light switch and wiring.

25th May 2022
Plastering Finished
Boosts the strength of the wall.

Plastering makes the wall more and stronger and gives it a more shiny and robust look in any drywall. It is suitable for all types of walls, from the most traditional to the most modern. Photos here shows plaster repair on walls and ceiling. The stairs were fixed securely to the wall at the top left of stairs. Made all parts of the stairs secured and fixed panelling to bottom side of stairs.

20th June 2022
Bathroom Renovation
Bathroom in Progress

The renovation includes decorating throughout and redesigning the bathroom. Upgraded the plumbing as required - including pipework. Installed new shower cubicle, bathroom suite including vanity unit/sink, toilet and bath. There' s wetwall - with chrome strips on joins and edges. A new extractor fan was also installed.

23rd June 2022
Bathroom Floor
Tiled Floor

LVT(Luxury Vinyl Tile)are being used on the bathroom floor. This type of product is popular due to its durability effectiveness, low maintenance requirements, and ease of installation.

15th July 2022
Kitchen Update
Flawless Countertop

This is the kitchen in progress where new coving was fitted. A 12 (medium)-16(large) units - L shape with island. With slab-fronted doors, chrome handles, and matt grey with laminated marble worktop. New electric oven unit, electric hob, and electric extractor fan - on new location directly opposite the kitchen door were installed.

11th August 2022
Latest Update
Almost Ready!

These are the updated photos of the property after the renovation. It is not 100% completed yet but just needs a few more finishing touches and it is good to go.

29th September 2022
Rear Door Brickwork
Finishing Touches

The brickwork at the rear door is now fixed, looking very smart and - most importantly - safe for the wee ones.

4th October 2022
Completed Refurbishment
The New Look

Here is the fresh new look of Edgar Avenue. The refurbishment has just been completed.

Before and After
Old vs New

Here are the before and after photos of the property.

>

Edgar Avenue

Financial overview

Purchase Price
£56,000
Rent
£650
Yield
13.93%
ROI
10.4%
ROCE
26.5%
DUV (Done Up Value)
£100,000